Antequera – Granada High-Speed line: Bobadilla Node (Antequera)

RAILWAYS

Construction of track bed for the Antequera-Granada High-Speed Railway Line. Section: Bobadilla Node (Antequera). Phase II.

The Bobadilla Node (Antequera), Phase II, has a length of 6.15 km and runs through the municipal territory of Antequera, in the province of Malaga. This is the section where the branch points/junctions that make the high-speed connection between Malaga and Granada possible are located.
The new layout has been designed for high-speed double track with international gauge and for passenger transport only. As unique elements, there stand out the pergola over the Cordoba-Malaga high-speed railway line and the Viaduct over the Arroyo de Las Lomas.
The project contains the necessary actions for the execution of the infrastructure works, such as: earthworks, drainage works, structures, restoration of affected services, and the construction of cross connections that ensure the permeability of the railroad.

Details

LOCATION

Antequera, Malaga

AMOUNT

€ 32.209.574

CLIENT

Entidad Pública Empresarial Administrador de Infraestructuras Ferroviarias (ADIF)

Scroll al inicio
Resumen de privacidad

Esta web utiliza cookies para que podamos ofrecerte la mejor experiencia de usuario posible. La información de las cookies se almacena en tu navegador y realiza funciones tales como reconocerte cuando vuelves a nuestra web o ayudar a nuestro equipo a comprender qué secciones de la web encuentras más interesantes y útiles. Ver nuestra Política de Privacidad.