Madrid – Galicia High-Speed line: O Cañizo tunnel

RAILWAYS

Track bed construction project. North-Northwest High-Speed Corridor. Madrid – Galicia High-Speed Line. Section: O Cañizo Tunnel. Right track.

This project developed for ADIF consisted in the construction of the track bed – a 6.64 km section – of the new Madrid-Galicia high-speed railway line, in the section: O Cañizo Tunnel. Right track. The route is located in the province of Ourense and runs through the municipal territories of A Mequita and A Gudiña.
Due to the length of the tunnel, it was designed with a single-track section, parallel to the tunnel corresponding to the left track, with a single-track bi-tube section being thus generated.
The length of the tunnel excavated totals 5,271 metres and it was executed using conventional methods following the New Austrian Method (N.A.T.M.) with a geometric section, with a free section of 52 m2.

Details

LOCATION

Ourense

AMOUNT

€ 58.778.544,39

CLIENT

Entidad Pública Empresarial Administrador de Infraestructuras Ferroviarias (ADIF).

Scroll al inicio
Resumen de privacidad

Esta web utiliza cookies para que podamos ofrecerte la mejor experiencia de usuario posible. La información de las cookies se almacena en tu navegador y realiza funciones tales como reconocerte cuando vuelves a nuestra web o ayudar a nuestro equipo a comprender qué secciones de la web encuentras más interesantes y útiles. Ver nuestra Política de Privacidad.